public case study
Mettupalayam Municipality Water Treatment Solar
Mettupalayam, Coimbatore District · 2022 · 40 kWp
40 kWp
installed capacity
63,072 kWh
generated per year
₹3,74,400
saved per year
44.7 t
CO2 offset per year
Project photos
Site and installation context
“
The water treatment plant now runs on 70% solar during the day. The project has paid back 40% of its cost in 2 years.
Project details
- Project
- Mettupalayam Municipality Water Treatment Solar
- Location
- Mettupalayam, Coimbatore District
- Year
- 2022
- Capacity
- 40 kWp
- Sector
- public
Products used
Systems behind this result
Plan similar results
Want results like P. Selvam?
Share your site type, location, and monthly load. We’ll map a practical proposal around your use case.